Plan an evaluation

A decision you can test.

Evaluate Flower® with one representative flow, explicit success criteria and a documented handover. Production experience since 2019 informs the work; your own measurements determine suitability.

Discuss your flow ↗

01Define the workload

Name the source and destination, volume and file-size distribution, arrival rate, schema, deadline and retention. Use synthetic or approved data and write down the expected result before running the flow.

02Agree on acceptance

Check counts, identifiers, totals, duplicate behavior and downstream readability. Inject temporary failures and bad input. Record which work is repeated, which is quarantined and when an operator is alerted.

03Measure the complete cost

Record software version, CPU, memory, storage, network limits and provider region. Measure throughput, p95 delivery time, peak memory, bytes transferred and operator time across repeated runs. Include egress, request charges, licensing and support in the cost model.

04Handover and decision

Deliver the reviewed configuration, test results, unresolved limits and operating runbook. Agree ownership, access, rollback, escalation and support scope. Production rollout, commercial terms and service commitments are agreed separately; no fixed performance or SLA is implied by the evaluation.

Discuss your data path

Turn the requirement into a reliable production flow.

Describe the source, destination, volume, constraints, or failure mode. You will speak directly with the team that builds Flower.

Talk to the Flower team